RETAIL FULFILLMENT CENTER - GYMBOREE

DIXON, CA

WWI removed over a million sq. ft of pallet rack along with over 8,000 sq. ft of office furniture in a 270,000-square-foot distribution facility. This client is a leading brand for children's clothes and is headquartered in Dixon, CA. 

1,000,000

racking & conveyor

was removed

SQ FT

80,000

SQ FT

mezzanines were

removed

40 

forklifts were 

removed

8,000

SQ FT

office furniture

was removed

IMG_0208.HEIC
Costco-logo.png

FOOD DISTRIBUTION - COSTCO

OCALA, FLORIDA

For this project, WWI was contracted for the below scope of work: 

- Build a dust/noise control wall around the demo area

- Demo 7 pick modules 

- Demo the entire conveyor system inside the warehouse

- Temporarily relocate and keep 28 forklift charging stations and moved them back to their permanent location at the end of the demo process 

- Demo 2 existing dock doors and install a larger 21x16 electrical door 

** We were in charge of all the electrical work pertaining to the job and provided our own electrician 

Screen Shot 2022-08-10 at 11.24.30 PM.png
Screen Shot 2022-08-04 at 11.05_edited.png

RETAIL FULFILLMENT CENTER - MODWAY

HIGHTSTOWN, NEW JERSEY

For this project, WWI was contracted for the below scope of work: 

- Removed racking

- Epoxy fill all holes in the floor

- Drywall repair

- Removed all Forklifts and chargers

- Cleaned building for turn back

- Pallet removal

- Compactor removal

- 60-day removal