top of page
AssetSolutions_edited.png

SOLUTIONS FOR YOUR
DECOMMISSIONING PROJECTS

In partnership with our national affiliates, Asset Solutions provides turnkey industrial decommissioning services. The end-to-end process includes everything from inventory to liquidation, labor, logistics, and dispositions. Green by design, the program aims to divert reusable items from landfills. With over 40 years of experience, our team of highly skilled experts is ready to deliver an efficient, cost-effective solution to your most challenging decommissioning projects.  
Screen Shot 2022-08-02 at 8.18.54 AM.png

2001

YEAR ESTABLISHED

2,000

PROJECTS COMPLETED

500

SQ.FT

200

INDUSTRY PARTNERS

MIL

+

SERVICES

OUR PROCESS

AdobeStock_292161862.jpeg

DETAILED INVENTORY ANALYSIS

After the initial contact, we work to establish communication with the client to figure out their specific needs. Once this has been established, we will schedule a walkthrough of the site. The original walkthrough is the first phase of the job and is crucial to the success of the project.  After the walkthrough, a representative of Asset Solutions assembles an extensive and well-detailed inventory of everything at the site that was established in the scope of work. The representative will count every piece of material, measure every square inch, linear foot, and write down all pertaining information from the equipment (including serial number parts number, etc ).

SCHEDULE COORDINATION

The representative creates an original plan with all working contractors to establish an estimated timeline for when the project will be completed. The timeline is then presented to the client to keep track of the progress. The representative is on the site every day to make sure that the job will go smoothly and in a timely manner. The representative is communicating on a daily basis with the VP Project Manager to ensure the project is on schedule with the forecasted timemline.

PROJECT REPORTING

When the project is finished, the representative is responsible for completing a final walkthrough with the client to sign off on the project conclusion. Asset Solutions will then establish a final report of the completed project.

LIQUIDATION MANAGEMENT

Once the representative has all the needed information, the team working on the project will get together and evaluate all the assets that are part of the agreed scope of work. We will then present our numbers to the client for approval. Once the client has approved the price and we have a signed contract, an Asset Solutions project manager is then assigned to that specific site. The project manager's responsibilities include: facilitating and coordinating the liquidation process, overseeing safety procedures, managing equipment being delivered to the site, coordinating and cataloging all logistics for every and all equipment leaving the site,  as well as being the source of communication.

ABOUT
Screen Shot 2022-07-31 at 9.40_edited.png
AdobeStock_325994810.jpeg

TO PREVENT ASSETS FROM
REACHING THE LANDFILL

OUR MISSION

Prior to project initiation, Asset Solutions representatives and its clients collaborate to set specific waste diversion goals. From that point forward, records of all asset disposition, scrap, recycled/re-manufactured goods, and landfill will be maintained. 

Upon request, Asset Solutions can present the client with a comprehensive waste diversion report, complete with a certificate of landfill avoidance percentage. 

map-01_edited.png

OUR CAPABILITIES & SERVICES

AssetSolutions1-01.png
AssetSolutions1-01.png
AssetSolutions1-01.png
AssetSolutions1-01.png
AssetSolutions1-01.png

SAFETY IS OUR TOP PRIORITY

SAFETY MANAGER

Asset Solutions has an in-house
safety manager that is certified in PEC, Safe Gulf, Safe Land to train the trainer, OSHA Standards and Compliance, and H2S Clear.

INSPECTION

It is mandatory that tools and
equipment are inspected at the
beginning of every workday.

INSURANCE

PPE

STOP WORK AUTHORITY

Every contractor is vetted before
being awarded a contract by Asset solutions. Each contractor must provide proof of insurance.

It is mandatory that proper personal protection equipment is worn on the job site. It is the responsibility of the foreman and/or project manager to ensure that everyone is wearing PPE.

If you see something, say something. Work is stopped anytime unsafe conditions or behavior occur and work will only proceed after given all-clear by foreman. 

Screen Shot 2022-07-31 at 10.21_edited.png

PALLET RACK INSTALLATION

WAREHOUSE LIQUIDATION

ASSET RECOVERY

DECOMMISSIONING

PROPER DISPOSAL

INDUSTRIES WE SERVE

OUR SERVICES ARE GEARED TOWARD NEARLY ALL SECTORS IN
COMMERCIAL AND INDUSTRIAL INDUSTRIES, BUT WE SPECIALIZE IN:

map-01_edited.png

MANUFACTURING

FULFILLMENT

WAREHOUSING

DISTRIBUTION

OUR CLIENTS

big lots.jpeg
Chase-Logo.png
kaiser-permanente-logo_edited.png
Gymboree_logo.svg.png
loreal-logo-png-transparent (1).png
boeing.png
PROJECTS
Screen Shot 2022-08-02 at 8.32.34 AM.png

MODWAY

1.2 million sq. ft of pallet racking was removed in 3 months

GYMBOREE

1,000,000 sq. ft of racking and conveyor removed in 3 months.

PAST PROJECTS

background-01_edited.png
C12C3C34-3C04-45C5-9887-127749343805.jpg

WALLACE 

WILLIFORD

NATIONAL DIRECTOR

IMG_9997.jpg

DAVID

WILLIFORD

PRINCIPAL

Katie profile photo.jpg

KATIE TODD

VP PROJECT MANAGER

GARY.jpeg

GARY SANDER

ACQUISITIONS

thumbnail_IMG_0720.jpg

PAUL 

VAN LIEFDE

SALES AND DESIGN

image_50372353.JPG

RAND LAINE

PROJECT MANAGER

Screenshot_20220722-072143_Gallery.jpg

DANNY WARD

PROJECT MANAGER

FC_20220722_0002.jpeg

JORRY

ABRAHAM

SENIOR PROJECT MANAGER

CONTACT

MEET OUR TEAM

LET'S GET STARTED

Every connection starts with a conversation. Our team is here to help you with all of your decommissioning solutions. 

Thanks for subscribing!

bottom of page